What does a plant represent in PP?
S/4HANA Production Planning (PP)
SAP_C_TS422_2023Ready to test yourself?
A timed, blueprint-proportional exam drawn fresh from this bank โ with a per-domain score report.
๐ Free preview: showing 10 of 80 questions. Unlock the full bank โ every question, explanation, and reference.
Unlock all 80 questions โ10 questions across 5 topics. Choose an answer for each question, then check it to see the correct answer and explanation.
Filter by topic
All 10 questions
PP Organizational Structure and Master Data
10 questions in topicPlant, work centers, bills of materials, routings, and material master PP views.
What does a work center represent?
What does a bill of materials (BOM) define?
What does a routing define?
What does a control key on a routing operation determine?
What does the MRP type field on a material master control?
What does the lot size field on a material master define?
What does a production version link together?
A factory has three identical CNC machines that can each perform the same operation interchangeably. What capacity configuration models this?
A material can be produced on Line A using Routing 1, or on Line B using Routing 2, both with the same BOM. What should be configured for each valid combination?